What inspections are required for my building?
At a minimum, the following inspections are required: structural frame (for any required fire resistance and/or fire separation requirements), electrical rough-in; HVAC rough-in; and final inspection for issuance of the Certificate of Occupancy (Compliance). Any Fire Marshal's Office Inspector or Investigator may conduct an inspection at any time to verify construction documents are on-site. Failure to produce construction documents/permits upon request may result in any of the penalties listed below: penalty assessment, and/or revocation of the permit, and/or refusal to allow final utility connections, and/or denial of the Certificate of Occupancy (Compliance).

Show All Answers

1. What law regulates the County authority to require building permits?
2. When is a building permit required in the unincorporated areas of the county?
3. Who has to get a building permit?
4. What is a "substantial improvement"?
5. What is a commercial establishment (building)?
6. What is a public accessible building?
7. What is a multi-family residential building?
8. What do I have to do to get a building permit?
9. What other permits must be obtained?
10. How long does it take to obtain a building permit?
11. How much does a building permit cost?
12. How long is a building permit valid for?
13. What are the Codes used by Bexar County?
14. What local amendments are enforced by Bexar County?
15. What inspections are required for my building?
16. Who inspects my building project?
17. I'm building a private residence, what permits are required?
18. How do I get a Certificate of Occupancy for my home?
19. I'm building in the San Antonio ETJ, what other requirements must I comply with?
20. I'm building in the Helotes ETJ, what other requirements must I comply with?
21. How is my property zoned in the County?